Scroll
MIRU   AI
Site Intelligence for EPC Construction
Miru AI City
AI-Powered · Live
Discover the Future of Construction

Site Tracking
While You Sleep

Welcome to Miru, the AI-powered construction platform that's transforming the industry

No BIM. No hardware. Just results.
The Smarter Way to Build

Build smarter.
Monitor nonstop.

Miru is the AI-powered construction platform that transforms raw site data and WhatsApp updates into polished reports — 100% automated, with zero manual effort.

Instant Reports

Auto-generated progress reports delivered to your inbox — no site visits required.

🛰

Real-Time Intelligence

Live WhatsApp feeds analysed by AI to surface delays, material shortages, and issues before they cost you.

🔗

Zero Integration

No BIM, no expensive hardware. Works on top of WhatsApp and existing site workflows.

No BIM. No hardware. Just results.
Platform Suite

Meet the Miru Ecosystem

Tools and insights designed to streamline your entire construction workflow

Z
Automated Access
ZORO

Automated site
bot access
— your AI agent that works around the clock so you never miss a beat.

P
AI Reports
WhatsApp → Reports

Empower your construction team with Miru's AI, instantly turning WhatsApp updates and site data into polished Excel and PPT reports

M
Full Platform
Miru Platform

With Miru, you'll have the tools and insights you need to streamline workflows

What Miru Does

Automated intelligence.
Built for site teams.

Structured reports, real-time follow-ups, and AI-powered monitoring — built for EPC construction teams managing live operations.

📊
Cross-Site Dashboard
Portfolio-wide attendance, issues, and variance — without morning calls.
⚖️
Plan vs Actuals Tracking
Spot variance before it becomes a site call.
📋
Instant Structured Reports
DPR, DLR, variance reports compiled from WhatsApp data. Zero manual effort.
Voice Note Support
Too busy to type? Voice notes captured and structured just like text.
🌐
Multi-Lingual Support
Hindi, Telugu, English — all captured consistently.
🤖
AI Follow-Ups
Missing update detected — targeted DM sent. No manager follow-up needed.
🗺️
Work Front Mapping
Filter any report by work front, trade, or activity.
👤
Smart Member Profiling
Role and context built in — ambiguous messages always resolve correctly.
Cross-Site Dashboard · Miru AI
Active Sites
12
↑ 2 this week
Workers Today
1,340
vs 1,292 yesterday
Open Issues
9
4 critical
ProjectStatusVarianceLast Update
Kalpataru Heights — T3 On Track 0% 8 min ago
Shapoorji Phase 2 — Block A ⚠ Delayed +3d 24 min ago
L&T Civil — NH48 Flyover On Track -0.3% 1 hr ago
Aditya Birla Township — MEP Behind Behind 2 hr ago
Godrej Aqua — GF Finishing On Track +0.5% 3 hr ago
● Live · No morning calls required

Attendance, open issues, plan vs actual variance — aggregated across all your sites. The independent signal you never had, built entirely from WhatsApp groups your site teams already use.

Plan vs Actuals · Miru AI
Plan vs Actuals
Wing C · Level 8 Slab Pour Structural — Concrete
TARGET
140 m³
May 3
−4 m³
ACTUAL
136 m³
May 3
Block D · Unit 802 — Electrical MEP — First Fix
TARGET
May 4
Behind 2d
ACTUAL
May 6
Podium · East Wing — Waterproofing Waterproofing
TARGET
520 sqm
May 2
+40 sqm
ACTUAL
560 sqm
May 2

Compare planned targets against actuals in real time. Spot variance early, understand what's slipping and why — before it becomes a delay on the Gantt.

Daily Progress Report #067 · Miru AI
● Site: On Track ⚠ 3 Critical · 2 Medium 318 Workers on site
Progress by Workfront
ZoneActivityStatus
W1 · F4–F6 RCC Columns Completed
W2 · F3 Brick Masonry In Progress
W3 Slab Shuttering In Progress
W4 · F8 External Plaster Planned
Basement Waterproofing Delayed
Issues & Blockers
Transit mixer breakdown — Gate 2 Critical Open
TMT steel — short by 3 bundles Medium Open
Prepared by Miru AI · Export: PDF / XLSX

DPR, DLR, Variance reports — compiled on demand from your WhatsApp data. No manual assembly, no formatting, no midnight scramble before review meetings.

WhatsApp Group · Site Update Feed
Arun (Foreman)
W3 slab shuttering done — checking levels now. Ready for concrete by 4pm if QC clears.
09:42 ✓✓
Vikram (Supervisor) · Voice Note
🎙️
0:38
09:55 ✓✓
Miru AI · Voice → Text Auto-structured
Transcript · Vikram
Gate 2 transit mixer is stuck — engine issue. Backup arranged, ETA 11:30. W3 pour may slip to 5pm. Boom pump still booked, no change on labour strength.
W3 · Slab Pour Risk · Delay

Short on time to type? Voice note in your groups — captured and structured from your WhatsApp data, same as text. No app change or new habit required from site teams.

Multi-Lingual · Same Pipeline · Any Script
अरुण
W3 का शटरिंग हो गया है। QC देख ले तो 4 बजे तक कंक्रीट डाल सकते हैं।
09:42 ✓✓
विक्रम
Gate 2 का ट्रांजिट मिक्सर खराब हो गया। Backup आ रहा है 11:30 तक। Pour शायद 5 बजे होगा।
09:55 ✓✓
प्रकाश (QC)
Level check done hai — slab ready hai. Jab bhi material aaye, hum ready hain.
10:03 ✓✓
Miru AI · Structured Output
English Hindi Hinglish Telugu
W3 slab shuttering complete. Pour delayed to 17:00 — transit mixer breakdown at Gate 2, backup ETA 11:30. QC level check done; slab ready. Labour strength unchanged.
● Updates read in context — whatever the language

Your WhatsApp updates can be in English, Hindi, Hinglish, Telugu, or any regional language, and Miru interprets them all consistently into the same structured format.

AI Follow-Up · Miru Auto-DM
Arun (Foreman)
W3 slab casting done. Good finish. Ready for curing.
17:12 ✓✓
Miru AI Why a Follow-Up
No photos attached. Completion note for slab casting requires photographic evidence for QC records before curing begins.
Auto-DM Sent to Arun Miru AI · Auto-Sent
Hi Arun, noted on W3 slab casting. Please share 2–3 photos of the slab surface before curing starts — needed for QC sign-off. Thanks.

When Miru detects a missing update — completion note without photo, labour not reported, commitment without a deadline — it sends a targeted WhatsApp DM to the right person. No manager intervention needed.

Work Front Mapping · Miru AI
6
Wing A · 5F Slab
Active
3
Wing A · 4F Finishing
In Progress
1
Wing B · Unit 304
⚠ Issue
Wing B · Unit 210
✓ Done
5
Wing C · 3F Brick
Active
2
Basement · Waterproof
In Progress
1
Clubhouse · Tiling
Inspection
Gate Area · Paving
No update
STP Zone · Civil
✓ Done
Filter by: Work Front · Trade · Activity · Date

Slice reports by work front, trade, or activity. See exactly what's happening where — all inferred automatically from WhatsApp updates with zero manual tagging.

Smart Member Profiling · Miru AI
A
Arun Sharma
Site Foreman·Civil & Structural·Hindi
54
updates
3
issues
★ Reports labour at 8–9 AM consistently. Flags material issues before they escalate.
V
Vikram Nair
Supervisor·Finishing Works·Malayalam
38
updates
5
missed
★ Commits targets reliably but follow-through rate is 68% — Miru flags delays early.
P
Prakash (QC)
QC Inspector·Quality & Safety·Tamil
21
inspections
0
missed
★ Files inspection requests before noon, every time. Miru auto-assigns QC tags.

Role, trade, and work front context combined with conversation history — so ambiguous updates resolve correctly. A message means something different depending on who sent it.

No BIM. No hardware. Just WhatsApp.
03 / 05
Intelligence
Intelligence Layer
Why Miru

Built for the Chaos
of Real Construction

Most software assumes your site is clean, connected and predictable. Miru was designed for the opposite — noisy data, offline workers, and deadline pressure.

✦ WhatsApp-native input ✦ No internet dependency ✦ Works with any site size ✦ Vernacular language support ✦ One-tap report sharing ✦ Predictive delay alerts
04 / 05
Contact
Get in Touch
05 / 05
Footer